The yards will be graded flat at the designated area and with adequate drainage. And also, those fabricated, cast, assembled products will be temporarily stocked at the Stock yard. It is necessary to set up a fabrication yard in order to carry out the fabrication of reinforcing bars, form work, steel frames and so on. Location and plan shall be considered to avoid traffic and congestions during mobilization of materials, machines and obstruction to construction during the course of different activities in the site. Temporary yard such as stockpile and fabrication yard for building work shall be prepared within the site after soil improvement. Preparation for Building Construction Works To summarize the process building work is depicted by the following flow chart: